Bangabandhu Sheikh Mujib Railway Bridge Construction

Bangladesh Railway is going to introduce a new railway bridge over the river Jamuna parallel to the existing Bangabandhu Bridge. The bridge will improve the capacity and safety of railway transportation in Bangladesh and contribute to efficient logistic network within the country and with neighboring countries in South Asia. This new dedicated railway bridge will be constructed under a project of Bangladesh Railway titled `Bangabandhu Sheikh Mujib Railway Bridge Construction Project` and the name of the structure will be ” Bangabandhu Sheikh Mujib Railway Bridge’. The project is going to be implemented under Government of Bangladesh and Japan International Cooperation Agency (JICA) fund.

This Project is termed as flagship project between Japan & Bangladesh and it is one of the five projects included in the Japan-Bangladesh Comprehensive Partnership joint statement which was signed in May 2014. After completion of the first feasibility study with support from the Asian Development Bank, Honorable Prime Minister Sheikh Hasina requested Japanese funding for the project when she met Japan’s Prime Minister Shinzo Abe on May 2014 during her Japan visit. The project was approved in ECNEC meeting on 06 December 2016. The first revision of the project was approved on 3rd March 2020 as per the accepted tender. Total cost of the 1st revised DPP of the project is BDT 16780.9563 Crore in which GOB-BDT 4631.7584 Crore and JICA project aid-BDT 12149.1979 Crore. The implementation period of the project is 01 July 2016 to 30 December 2025.

The new railway bridge will improve accessibility to the cities between the eastern and western part of the country through increasing the railway network. It will improve the operational efficiency and financial performance of Bangladesh Railway through higher productivity, asset utilization and lowering operational cost. It will contribute to improve connectivity for international freight (container) traffic along the Trans-Asian railway.


Under the project a dedicated Railway Bridge (approximately 4.8 km) will be constructed with the provision of Dual Gauge Double track over the River Jamuna, parallel to and approximately 300m upstream of the existing Bangabandhu Bridge.




Key areas

  • Accommodation (Civil, Electrical, Plumbing Work)
  • Road & Fence


Client : Sumitomo Mitsui Construction Co., Ltd.

Location : Tangail, Alenga

Duration : December 2020 - May 2021




Key areas

  • Restaurant
  • Playground
  • Car parking shed


Client : OTJ joint venture

Location : Tangail, Alenga

Duration : June 2021 - October 2021




Key areas

  • Foot Over Bridge
  • Platform
  • Station Building
  • Badminton Court
  • Car Parking Shed
  • Watch Tower


Client : OTJ joint venture

Location : Tangail, Alenga

Duration : December 2022 - July 2024



Our project image


743UMKz.jpg

CALL US NOW
Office: +880241040056
 
COME VISIT US
House # 4/A, Lake Drive Road
Nikunja-1,Dhaka 1229
SEND US A MESSAGE
Managing Director: shahin7572@yahoo.com
Info: daruma.enayet@gmail.com

We may use cookies or any other tracking technologies when you visit our website, including any other media form, mobile website, or mobile application related or connected to help customize the Site and improve your experience. learn more

Allow